Here is an example of an ideal permanent access system that is used at the Tyne RC which is a 15 metre wide concrete slipway that enables craft to be launched at any state of the 5 metre tidal range that they have at their location.
The only hurdle being the expense and planning involved to obtain this.
__544__.png)